Contract pilot trials at an industrial fibre pilot plant.

A pilot plant is where a material process proves itself between the laboratory and the factory: large enough to generate real production data, small enough that experiments are affordable and failure is cheap. Loonshot Factory operates an industrial fibre pilot plant in Lemi, Finland — a full fourdrinier pilot paper machine, batch pulping and refining, molded fibre development, and an on-site pulp-and-paper laboratory — available on contract.

You bring a material concept, a feedstock or a product specification. We run the trials, measure everything, and hand you a documented process that can carry investment decisions, customer qualifications and scale-up.

HEILI pilot paper machine and hall at Loonshot Factory, Lemi.

CAPABILITIES · 01

What you can run here

Pulping & refining trials

Batch pulping of recycled textile fibre, agrofibres and other non-wood raw materials, then systematic refining development on industrial equipment. Energy curves, freeness targets and fibre morphology are measured, not guessed.

What we develop →

Paper machine trials

Full pilot runs on our fourdrinier machine: forming, pressing, drying and reeling of packaging-grade papers from novel furnishes. Machine-made paper in roll form — material your customers can actually convert and test — with parameters recorded run by run.

Molded fibre development

Forming and thermoforming trials for trays, clamshells and protective packaging from novel pulps, with rapid prototype tooling.

Molded fibre packaging →

Laboratory validation

Tensile, tear, burst, Cobb, porosity, freeness and optical fibre analysis on site, plus an extended external network for barrier, food-contact and compostability testing.

Full instrument list →

SCALE · 02

From one trial day to toll production

Engagements scale with your project, not the other way around. A first trial can be a single pulping batch or one machine day. A development project runs for weeks with recipe iteration and a documented data pack at the end. When a process is proven, the same facility runs it as recurring toll production — contract manufacturing on pilot-scale equipment, producing real sellable material while your own capacity is financed and built. The four engagement levels are described under access tiers.

PROCESS · 03

How a trial is run

  1. STEP 01

    Scope

    Target material, feedstock, specifications and success criteria agreed in advance.

  2. STEP 02

    Prepare

    Feedstock logistics, furnish preparation, trial plan with measurement points.

  3. STEP 03

    Run

    Experienced operators run the equipment; you are welcome on the floor throughout.

  4. STEP 04

    Measure

    Laboratory testing against the agreed specification.

  5. STEP 05

    Report

    A written trial report with full parameter records and results — yours to keep and reuse.

Confidentiality is standard practice: client projects are anonymised by default and most programs run under NDA.

Fibre stock forming on the wire during a pilot machine trial at Loonshot Factory, Lemi.

QUESTIONS · 04

What is a materials pilot plant — and why use one?

A pilot plant reproduces the essential physics of a production process at reduced scale. For fibre-based materials that means real continuous forming, pressing and drying — the things a laboratory sheet former cannot show. Companies use contract pilot trials to de-risk scale-up, produce demonstration material for customer qualification, generate investment-grade data, and avoid capital commitment until the process has earned it.

Can I be on site during my trial?

Yes — clients are welcome on the floor throughout. Most trials benefit from having the technical owner present when parameters are being set.

CONTACT

Scope a pilot trial.

Describe the material, the feedstock and what you need to prove — we respond with a concrete trial plan.